2024 Storm Drainage & Outfall Repair

LOCATION

Grande Prairie, Alberta

CONSTRUCTION DURATION

August – December, 2024

Spring work pending

About this Project

This project, sponsored by the City of Grande Prairie, consisted of the installation/replacement of PVC storm sewer lines to repair distressed infrastructure, outfall improvements, asphalt restoration (urban and trail locations) and landscape restoration, at seventeen locations throughout the city.

Extra work was requested by The City to address additional repairs in a residential neighbourhood to due to the deterioration of the infrastructure  and address other field changes needed at multiple locations.

Construction particulars included

  • Project start up activities; contract execution, submittals (ECO/ESC Plan, TAS, Schedule, Shop Drawings, Permitting), and procurement
  • Installation of 300/375/450/525/750/1050mm PVC storm sewer (366m, total) c/w fittings, manholes, catch basins and CCTV inspection
  • 450mm flared end and 750mm headwall replacements
  • Installation of 300/400mm CSP culvert (30m, total) with rip rap end treatments
  • Asphalt pavement restoration (3,150m2), urban/trail landscape restoration

CONSTRUCTION TEAM

Johan Kruithof, General Manager  Brad Buffalo, Construction Manager Brandy Braun, Project Manager  Albert (Albie) Kavanaugh, Foreman

LOCATION

Grande Prairie, Alberta

CONSTRUCTION DURATION

August – December, 2024

Spring work pending

PROJECT BUDGET

$2,207,000

Extra work $160,000

FINAL PROJECT VALUE

TBD

CLIENT

City of Grande Prairie

Alissa Hodson, C.E.T., 780.513.5234

ahodson@cityofgp.com

CONSULTANT

McElhanney

Kyler Lucas, C.E.T., 250.300.3301

klucas@mcelhanney.com

KEY FIRM

Option Excavating Inc.