KCN Water Distribution Line – Phase 2

LOCATION

Kehewin, Alberta

CONSTRUCTION DURATION

October 2023 – November 2025

About this Project

Kehewin Cree Nation sponsored an upgrade the existing water treatment plan and provide water services to 68 residences. Option worked with the Nation to find cost savings of $2.5 million, providing an opportunity to expand the project scope to include additional phases (2B, 2A and Hwy 41). Option was also able to participate in the pilot program for Pehta, a new financial reporting tool for First Nations.

 

Construction particulars included, over an above landscape restoration

  • Laydown and site preparation (clearing, grubbing and electrification)
  • 200mm water main installation (10.5km) via HDD and two tie ins to the existing infrastructure
  • Upgrades to the water treatment plan, including distribution pump system upgrade
  • 68 residential service connections of 40mm pipe via HDD, one trickle feed system installation, the decommission of 70 residential cisterns
  • Installation of air release valves (17), gate valves (13), and blow offs (5)

Extra work consisted of

  • Ph 2B – 200mm water main installation via HDD (2.7km)
  • Service connections via 40mm pipe via HDD; Ph 2B – 23 connections (2km) and decommission of 24 cisterns, Ph 2A – 11 service connections (1km) and decommission of 12 cisterns, Hwy 41 – eight service connections (1km), four cistern decommissions and four trickle feed system installations
  • Ph 2B installation of air release valves (2), gate valves (3), and one blow off

CONSTRUCTION TEAM

Johan Kruithof, General Manager  Steven Beath, Superintendent Brad Buffalo, Construction Manager   Albert (Albie) Kavanaugh, Foreman

Brandy Braun, Project Manager  Dana Sutherland, Foreman 

LOCATION

Kehewin, Alberta

CONSTRUCTION DURATION

October 2023 – November 2025

PROJECT BUDGET

$10,953,000

Extra work $3,316,000

FINAL PROJECT VALUE

$11,770,000

CLIENT

Kehewin Cree Nation #123

Denise Hourd, 587.201.6411

denise@kehewin.ca

CONSULTANT

WSP Canada Inc.
Gorin Gajic, 780.951.4080

gorin.gajic@wsp.com

KEY FIRM

Option Excavating Inc.

Let's start your project today

Let's turn your dream project into a reality! With our expertise and passion, we are committed to bringing your ideas to life. Contact us today and let's get started on making your vision a tangible success. Together, we can create something extraordinary.