About this Project

The Education Way Subdivision was sponsored by the O’Chiese First Nation to expand the number of residential homes on the Nation.

Option was engaged by the General Contractor to install the water and sanitary mains, and home connections in advance of roadway and lot preparation.

Construction particulars included

  • Project start up activities; subcontract execution, submittals (Schedule and Shop Drawings), staged procurement
  • Open cut installation of 200mm (1km) and 150mm (300m) of waterline, up to 5m in depth
  • Open cut installation of 100mm (500m), 75mm (500m) and 50mm (300m) of low pressure sanitary main
  • Installation of sanitary clean outs – 100mm (2), 75mm (3) and 50mm (4)
  • 42 residential water service and sanitary service connections with integrated sanitary grinder pump packages
  • Tie-ins to the existing infrastructure, hydrostatic testing, disinfection and swabbing & flushing of the waterline

CONSTRUCTION TEAM

Johan Kruithof, General Manager  Steven Beath, Superintendent Brad Buffalo, Construction Manager   Matt Giese, Foreman

Brandy Braun, Project Manager

LOCATION

O’Chiese, Alberta

CONSTRUCTION DURATION

August 2025 – ongoing

PROJECT BUDGET

$2,589,000

FINAL PROJECT VALUE

TBD

GENERAL CONTRACTOR

Prentice Creek Contracting Ltd.

Kelvin Wiley, 825.733.0367

Kwiley.pccl@gmail.com

CONSULTANT

Urban Systems

Benjamin Corenblum, 780.777.9009

bcorenblum@urbansystems.ca

KEY FIRM

Option Excavating Inc.

Let's start your project today

Let's turn your dream project into a reality! With our expertise and passion, we are committed to bringing your ideas to life. Contact us today and let's get started on making your vision a tangible success. Together, we can create something extraordinary.